Subsidy guide

In addition to investments, there are also subsidy schemes that you may be eligible for. We would therefore like to highlight the possibilities for you. We recently conducted research into subsidies specifically for smart energy hubs. You can recognise these subsidies below by the green label.

Current subsidies for entrepreneurs

£134 million
Deadline 30.07.2026
at 5:00 pm
Smart Energy Hub
Energy & Climate Innovation Demonstration (DEI+)

Have you developed an innovative technique with which your company can save energy or reduce CO2 emissions in the Netherlands? Then you can apply for the DEI+ subsidy for the pilot or demonstration of this technique. Before you submit the application, you can receive advice on your project idea and have it tested. This increases the chances of your project succeeding.

Total €300,000
Deadline 31.07.2026
at 5:00 pm
Smart Energy Hub
Regulation for the subsidy scheme for stimulating energy hubs North Holland 2026 (EHUBNH)

Are you, together with other entrepreneurs and the municipality, making plans for an energy hub or investigating whether an energy hub is possible and desirable? Then you can apply for a subsidy from the province of North Holland for this preparation and design phase. With this scheme, the province wants to stimulate the development of energy hubs and thus reduce grid congestion.

Total €70,000,000
Deadline 03/09/2026
at 5:00 pm
Smart Energy Hub
Mission-driven Research, Development and Innovation (MOOI)

Would you like to collaborate with other parties in a consortium on innovative solutions that contribute to climate goals for electricity, buildings, industry, or biobased circularity? And do you focus on practical application, taking into account technical, social, and other factors that increase the chance of success? Then apply for a subsidy with the MOOI scheme. Good to know: for the MOOI: Electricity subsidy, you must submit a preliminary application between 17 March and 16 April 2026.

Total €1,500,000
Deadline 01/10/2026
at 5:00 pm
Smart Energy Hub
Sustainable Hydrogen Projects Noord-Holland 2025 Subsidy Implementation Regulation (DUWANH)

The production, storage, transport, and application of sustainable hydrogen can offer flexibility around electricity and hydrogen grid hubs, thereby helping to reduce grid congestion. For this reason, the province of Noord-Holland is keen to actively stimulate the hydrogen economy. If you are involved in a sustainable hydrogen project (production, storage, transport, or application of sustainable hydrogen), please do check if you are eligible for this subsidy.

Total €1,500,000
Deadline 01/10/2026
at 5:00 pm
Smart Energy Hub
Implementation regulations for the subsidy for future-proof business parks North Holland (TBNH25)

This subsidy is intended for the sustainability, restructuring, energy transition, and quality improvement of industrial estates and port areas in North Holland. Via the solar panel fund, you can, for example, receive support for collective solar projects on large industrial roofs/facades (>15kWp) and grid congestion-neutral or grid congestion-reducing batteries, which directly contributes to relieving the electricity grid on industrial estates. The subsidy can be provided to municipalities and port companies.

€700 - €1,500 per voucher
Deadline 04.12.2026
SME Fund

The SME Fund is relevant for you if you have incurred costs with your startup, scale-up or SME for a patent application to protect your intellectual property rights. With a so-called SME voucher you can submit a claim for a refund of part of those costs.

Total €14,500,000
Deadline 18.12.2026
at 12:00 o'clock
Smart Energy Hub
Public Charging Infrastructure Subsidy Heavy Transport: SPULA

The government wants to accelerate the construction and expansion of publicly accessible charging sites for heavy electric transport. Are you working on a charging site accessible to all? Then check whether your project is eligible for subsidy for the costs incurred. If within two years the contracted power is insufficient to supply the power of your charging infrastructure at the charging location, you can also apply for a subsidy for a stationary battery.

Total €87,500,000
Deadline 18.12.2026
at 12:00 o'clock
Smart Energy Hub
Subsidy schemes for charging infrastructure: SPRILA

Do you want to install charging infrastructure for your company's electric work or company vehicles? Then consider the Subsidy Scheme for Private Charging Infrastructure at Companies (SPRILA). This scheme helps companies invest in private charging points with AC or DC charging stations and stationary batteries. This concerns charging infrastructure that may only be used at certain times by a specific group of users.

Total €460,000,000
Deadline 31.12.2026
Smart Energy Hub
Energy Investment Allowance (EIA)

The Energy Investment Allowance applies to investments that yield significant energy savings. With this, the government wants to provide a strong incentive for energy saving, CO2 reduction, and sustainable economic growth. As an entrepreneur, are you investing in energy-efficient assets and/or sustainable energy technologies listed on the Energy List? Then you can use the EIA and deduct 40% of the investment costs from your taxable profit.

Coming soon

Total €45 million
Open from 01.04.2026
Deadline 13.05.2026
at 5:00 pm
Hydrogen in Mobility Subsidy Scheme (SWIM)

Hydrogen is becoming an increasingly mature alternative to fossil fuels. Does your company, which has a special focus on heavy logistics transport, want to switch to driving on hydrogen or develop a hydrogen refuelling station? Then the Hydrogen in Mobility (SWIM) grant scheme is relevant for you! This grant is open for applications from 1 April to 13 May, with a total budget of €45 million.

Total €7,000,000
Open from 01.04.2026
Deadline 13.05.2026
at 5:00 pm
EKOO: Industry

Is your SME company working with other SMEs or researchers to make industry more sustainable? Then apply for a grant with the Energy & Climate Research and Development (EKOO) Industry scheme. The maximum grant per project is €500,000. For this grant, you must meet the general conditions that apply to all Top Sector Energy schemes. This is a tender: the highest-scoring applications receive grants until the budget is exhausted.

Total €3,000,000
Open from 01.04.2026
Deadline 22.04.2026
at 5:00 pm
EKOO: Biobased Circular

Is your SME working with other SMEs or researchers to produce biopolyesters based on bio-based carbohydrate-rich feedstocks? Then apply for a grant with the Energy & Climate Research and Development (EKOO) Biobased Circular scheme. The maximum grant per project is €500,000. For this grant, you must meet the general conditions that apply to all Top Sector Energy schemes. This is a tender: the highest-scoring applications receive funding until the budget runs out.

Total MIT €8,500,000
Open from 07.04.2026
Deadline 15.09.2026
at 5:00 pm
MIT Feasibility

De MIT Haalbaarheid is subsidie voor onderzoek naar de haalbaarheid van een technologische innovatie. De subsidie dekt 35% van de kosten voor o.a. materiaal, uren en het inschakelen van een deskundige en is maximaal € 20.000 per haalbaarheidsstudie. De MIT Haalbaarheid gaat van 7 april open. Aanvragen kan t/m 15 september. De regeling werkt volgens ‘wie het eerst komt, wie het eerst maalt’, dus wees er snel bij. Op dinsdag 24 maart 16:00-17:00 uur organiseert de Provincie Noord-Holland samen met ROM InWest een informatieve webinar. In een uurtje delen we alle belangrijke details over de regeling en staan we klaar om al je vragen te beantwoorden.

Total €5,000,000
Open from 22.04.2026
Deadline 28.05.2026
at 5:00 pm
EKOO: electricity

Is your SME working with other SMEs or researchers to improve renewable (sustainable) energy generation? Then apply for a grant with the Energy & Climate Research and Development (EKOO) Electricity scheme. The maximum grant per project is €500,000. For this grant, you must meet the general conditions that apply to all Top Sector Energy schemes. This is a tender: the highest-scoring applications receive grants until the budget runs out.

Total MIT €8,500,000
Open from 09.06.2026
Deadline 15.09.2025
at 5:00 pm
MIT R&D

With the SME Innovation Stimulation Top Sectors (MIT) subsidy scheme for R&D collaboration projects, you as an innovative startup, scale-up, or SME entrepreneur can receive a subsidy for a collaborative project with another company for the development of your innovation. Together, you can receive a maximum of €350,000 in subsidies. On Wednesday 24 June, the Province of North Holland, together with ROM InWest, is organising an informative webinar. In one hour, we will share all the important details about the scheme and will be ready to answer all your questions.

Total €8 billion
Open from 22.09.2026
Deadline 22.10.2026
at 5:00 pm
Smart Energy Hub
Stimulation of Sustainable Energy Production and Climate Transition (SDE++)

Is your innovation contributing to large-scale renewable energy generation or reducing CO2 emissions? Then the Sustainable Energy Production and Climate Transition Incentive (SDE++) may be of interest to you. The amount of this subsidy depends on the market price and the actual amount of renewable energy you generate or the effective CO2 savings you achieve. SDE++ opens on 22 September: prepare your application in advance!

Total €3,800,000
Open from 02.04.2027
Deadline 03.05.2027
at 23:59
Temporary subsidy scheme for Aviation in Transition: R&D Collaboration Project

Is your SME working with other SMEs on the development or innovation of products, production processes or services in the aviation sector? Then apply for a subsidy for an R&D Collaboration Project. The subsidy amounts to a maximum of 50% of the eligible costs up to a maximum of €350,000. The minimum amount per participant is €25,000, the maximum amount is €175,000.

Closed subsidies

Total €22 million spread over 2 calls per year
Deadline 19.03.2026
at 2:00 pm
Eurostars: grant international market-oriented R&D - 10th call

With the Eurostars grant, you accelerate the development of your innovation by collaborating with international partners. The scheme is aimed at start-ups, scale-ups and SME entrepreneurs who carry out R&D in a consortium with parties from other Eurostars countries and thus grow both their technology and their business. Tip: Ahead of the 10th call, a webinar explaining the application process and evaluation will take place on 8 January 2026 from 10:00 to 11:30. Sign up if you want to be well prepared.

Total €13,500,000
01.01.2026
Smart Energy Hub
Subsidy for flexible electricity consumption (Flex-e)

The Flex-e subsidises flex scans, feasibility studies and flexibility measures to help businesses and institutions consume energy more flexibly. Flexible energy consumption creates more room for electricity usage within the existing connection, enabling more businesses to start, grow or become more sustainable. Good to know: subsidy applications are handled on a first-come, first-served basis. So the sooner you apply, the greater your chance of receiving a subsidy. New application round expected in May 2026.

Total €8 million
Deadline 01.12.2025
at 5:00 pm
TKI LSH SME Call 2026 - PPP Innovation grant (round 1)

Would you and your company like to work with researchers on ground-breaking innovations in the Life Sciences & Health sector? Grab your chance now with the PPP grant of the Top Sector LSH! This grant encourages public-private research & development collaborations and helps develop sustainable, innovative products and services. Ready to grow your R&D project? Take the next step towards impactful solutions together. Please note: unlike last year, this year there will be one submission opportunity with a larger available budget.

Total €5,000,000
Deadline 30.09.2025
at 5:00 pm
Smart Solutions for Grid Congestion (URV SON 2025)

The province of Noord-Holland is reopening the subsidy scheme Smart Solutions for Grid Congestion (UVR SON). From 11 February to 1 October 2025, entrepreneurs can apply for a subsidy to gain insight into their electricity consumption. This helps them to save energy and spread their consumption more intelligently over the day. The subsidy amounts to a maximum of €15,000 per company, with a total budget of €500,000.

Total €500,000
Deadline 30.09.2025
at 5:00 pm
Smart Energy Hub
Implementation regulation for the subsidy for solutions to grid congestion in North Holland 2025 (ONNH25)

To take meaningful steps to save energy or spread it better over time, you first need to gain insight into your company's electricity consumption. With this subsidy, the province will help you with the costs of purchasing smart metering and monitoring equipment, external expertise, configuring the associated software, and project-related licence and/or subscription fees. The ultimate goal, of course, is to reduce grid congestion in North Holland. This subsidy scheme is being evaluated. It is not yet known if it will return in 2026 and in what form.

Total MIT €8,500,000
Open from 09.06.2026
Deadline 15.09.2025
at 5:00 pm
MIT R&D

With the SME Innovation Stimulation Top Sectors (MIT) subsidy scheme for R&D collaboration projects, you as an innovative startup, scale-up, or SME entrepreneur can receive a subsidy for a collaborative project with another company for the development of your innovation. Together, you can receive a maximum of €350,000 in subsidies. On Wednesday 24 June, the Province of North Holland, together with ROM InWest, is organising an informative webinar. In one hour, we will share all the important details about the scheme and will be ready to answer all your questions.

Total €3,944,000
Deadline 08.04.2025
at 12:00 o'clock
Subsidy for Circular Chain Projects (CKP)

Do you want to make your product, process or service more sustainable and do you need an experienced process supervisor? This is your chance to close your chain together with partners and contribute to an economy with less use of raw materials and CO2 emissions. Apply now for the Circular Chain Projects (CKP) subsidy and take the next step towards a future-proof business!